Hitachi Rail
Testing & Commissioning Intern
Sep 2025 – May 2026
Hong Kong SAR
Helped test a Hong Kong MTR control system, checking that equipment signals, backend services and operator screens showed consistent results.
- Checked 20,000+ monitoring and control points. Supported validation across field devices, servers, edge gateways and operator interfaces.
- Built automated tests with Python and Selenium. Turned I/O lists into repeatable test cases, so checks could run consistently at a large scale.
- Made complex web screens testable. Wrote JavaScript to reach controls inside nested Shadow DOM components that standard browser tests could not easily access.
- Made verification faster and easier to review. Automated checks and screenshot collection, reducing the verification cycle from 2–3 months to under 10 days while keeping traceable evidence.
- Investigated 10+ failures across system layers. Followed logs, service status and signal paths through Cloud Foundry services, Docker edge gateways and industrial controllers (PLCs) to find the cause.
- Supported system, factory acceptance and regression testing. Checked results against I/O mappings, recorded defects and test evidence, and tracked fixes and resolution status in JIRA.


